Getting started INFRA X20DM2

A quick guide on how to get your INFRA X20DM2 started

Start-up

1 Connect your X20DM2 with one INFRA Datalogger (INFRA D10, Master, Mini or Micro) by using any of the available INFRA Sensor Cables.

2 Connect X20DM2 to the external power. Osiris will then start automatically.

Note! If you want to run without external power, choose standard 02, you need to manually start the Osiris by pressing its “ON - Reset” key. The instrument can be run without external power for at least eight hours when Osiris is fully charged. If external power is lost in this standard, the interval data will be tagged with “Overload”.

3 Start the Datalogger and wait for the initialization process to be finished.

4 Make necessary adjustments of the parameters:

  • Standard (S01 or S02)

Note! INFRA X20DM2 has two selectable standards, S01 and S02.

S01: the inlet air is heated. Select when the air humidity is above 50% RH. This standard need external power, because the battery of Osiris is too weak to power the heating elements.

S02: The inlet air is without heating. The instrument can be run without external power for at least eight hours when Osiris internal battery is fully charged.

It is preferable to chose standard S01if possible to get the most accurate measurement.

  • Interval time
  • Upper threshold level (on/off, and value if on is selected)
  • Customer string via Remote Control in the PC-application INFRA Net Manager, or directly by using the Master display and keys.

Note! Each standard has its own parameters (Interval time, Upper threshold level, and Customer string).

5 Activate Monitoring ON (REG ON), and the measurement will be initiated.